N2 - In capital-intensive industries, physical assets and maintenance activities play a relevant and strategic role in terms of providing operational continuity and business sustainability. As a result, maintenance support structures are highly complex and sophisticated. Therefore, maintenance capacity planning must be addressed using reliable techniques to assure the adequate service levels and availabilities of critical assets at the minimum opportunity cost. There has been relatively limited research on how to determine and optimize the maintenance support structure (human resources) in such organizations. This paper proposes a novel technique for dimensioning and optimizing maintenance capacity that combines Time-Driven Activity-Based Costing and Life-Cycle Costing with the Weibull function-based reliability model. Following the main principles of the Design Science Research we propose a sophisticated but simple artifact. Through this model, it is possible to compute maintenance costs and assess both used and idle capacities, considering the behavior over time of the failure rates and the reliability of critical assets within a plant. To demonstrate how the proposed methodology addresses the problem, the model was applied in a real medium-sized Chilean comminution plant and a sensitivity analysis was performed, particularly, to evaluate the relevance of appropriate maintenance workforce planning.
AB - In capital-intensive industries, physical assets and maintenance activities play a relevant and strategic role in terms of providing operational continuity and business sustainability. As a result, maintenance support structures are highly complex and sophisticated. Therefore, maintenance capacity planning must be addressed using reliable techniques to assure the adequate service levels and availabilities of critical assets at the minimum opportunity cost. There has been relatively limited research on how to determine and optimize the maintenance support structure (human resources) in such organizations. This paper proposes a novel technique for dimensioning and optimizing maintenance capacity that combines Time-Driven Activity-Based Costing and Life-Cycle Costing with the Weibull function-based reliability model. Following the main principles of the Design Science Research we propose a sophisticated but simple artifact. Through this model, it is possible to compute maintenance costs and assess both used and idle capacities, considering the behavior over time of the failure rates and the reliability of critical assets within a plant. To demonstrate how the proposed methodology addresses the problem, the model was applied in a real medium-sized Chilean comminution plant and a sensitivity analysis was performed, particularly, to evaluate the relevance of appropriate maintenance workforce planning.
KW - Capacity analysis
KW - Economic sustainability
KW - Life-Cycle Costing (LCC)
KW - Maintenance costs
KW - Mining industry
KW - Time-Driven Activity-Based Costing (TDABC)
UR - http://www.scopus.com/inward/record.url?scp=85097887516&partnerID=8YFLogxK
U2 - 10.3390/math8122208
DO - 10.3390/math8122208
M3 - Article
AN - SCOPUS:85097887516
SN - 2227-7390
VL - 8
SP - 1
EP - 23
JO - Mathematics
JF - Mathematics
IS - 12
M1 - 2208
ER -