T1 - Assessment Model of Interactions Required in Design Teams in High-Rise Building Projects
AU - Herrera, Rodrigo F.
AU - Galaz-Delgado, Eduardo I.
AU - Atencio, Edison
AU - Muñoz-La Rivera, Felipe
AU - Castillo, Tito
N1 - Publisher Copyright:
© 2023 by the authors.
PY - 2023/7
Y1 - 2023/7
N2 - There is a lack of knowledge of the interactions required over time among the members of a building project design team. Without a specific target, it is impossible to identify gaps to propose improvement plans in the coordination and management of projects in the early stages. Therefore, this study proposes a model of the required interaction among the members of a building project design team during the different phases of the design process. The research was divided into three stages: (1) design team interactions; (2) construction of ideal interaction networks and proposed evaluation model; and (3) pilot cases—evaluation and analysis. Through this study, eight ideal networks were constructed, four for each interaction (information flow, collaboration, and coordination) and one for each design phase. In addition, a series of metrics were proposed to evaluate the current state of a building project, which, together with the constructed model networks, allowed the development of an evaluation method for real projects. Finally, two pilot cases were used to exemplify the use of the proposed model tool.
AB - There is a lack of knowledge of the interactions required over time among the members of a building project design team. Without a specific target, it is impossible to identify gaps to propose improvement plans in the coordination and management of projects in the early stages. Therefore, this study proposes a model of the required interaction among the members of a building project design team during the different phases of the design process. The research was divided into three stages: (1) design team interactions; (2) construction of ideal interaction networks and proposed evaluation model; and (3) pilot cases—evaluation and analysis. Through this study, eight ideal networks were constructed, four for each interaction (information flow, collaboration, and coordination) and one for each design phase. In addition, a series of metrics were proposed to evaluate the current state of a building project, which, together with the constructed model networks, allowed the development of an evaluation method for real projects. Finally, two pilot cases were used to exemplify the use of the proposed model tool.
KW - collaboration
KW - design teams
KW - information flow
KW - interactions
KW - social network analysis
UR - http://www.scopus.com/inward/record.url?scp=85166238849&partnerID=8YFLogxK
U2 - 10.3390/math11143073
DO - 10.3390/math11143073
M3 - Article
AN - SCOPUS:85166238849
SN - 2227-7390
VL - 11
JO - Mathematics
JF - Mathematics
IS - 14
M1 - 3073
ER -