TY - CONF
T1 - Exploring the relationship among planning reliability (PPC), linguistic action indicators and social network metrics
AU - Retamal, Fabián
AU - Salazar, Luis A.
AU - HERRERA VALENCIA, RODRIGO FERNANDO
AU - Alarcón, Luis F.
N1 - Funding Information:
We thank GEPUC and INGECO for their support in this research. Additionally, Luis A. Salazar acknowledges the financial support for his PhD studies from the Scholarship Programme of Conicyt Chile (ANID-PCHA/National Doctorate/2016-21160819) and Finally, Rodrigo H. Herrera acknowledges the financial support for his PhD studies from the Scholarship Programme of Conicyt Chile (ANID-PCHA/National Doctorate/2018-21180884).
Publisher Copyright:
© 2020 IGLC 28 - 28th Annual Conference of the International Group for Lean Construction 2020. All rights reserved.
PY - 2020
Y1 - 2020
N2 - Research has demonstrated the importance of information flow and workflow in the architecture, engineering and construction (AEC) industry. Through the correct application of the Last Planner® System, the coordination of a project and therefore its workflow has been improved. However, there is still a productivity gap that must be addressed through proper commitment management and good communication. Therefore, the objective of this article is to explore the relationship among planning reliability—using percentage plan completed (PPC) measures—linguistic action perspective (LAP) indicators and social network analysis (SNA) metrics in four construction projects that use the Last Planner® System in Chile and Colombia. A future line of research will be to analyze this relationship in conjunction with the main reliability indicators of construction projects through the application of PPC, LAP and SNA in more case studies.
AB - Research has demonstrated the importance of information flow and workflow in the architecture, engineering and construction (AEC) industry. Through the correct application of the Last Planner® System, the coordination of a project and therefore its workflow has been improved. However, there is still a productivity gap that must be addressed through proper commitment management and good communication. Therefore, the objective of this article is to explore the relationship among planning reliability—using percentage plan completed (PPC) measures—linguistic action perspective (LAP) indicators and social network analysis (SNA) metrics in four construction projects that use the Last Planner® System in Chile and Colombia. A future line of research will be to analyze this relationship in conjunction with the main reliability indicators of construction projects through the application of PPC, LAP and SNA in more case studies.
KW - Case studies
KW - Last Planner® System
KW - Linguistic action perspective
KW - Percentage plan completed
KW - Social network analysis
UR - http://www.scopus.com/inward/record.url?scp=85104884326&partnerID=8YFLogxK
U2 - 10.24928/2020/0031
DO - 10.24928/2020/0031
M3 - Paper
AN - SCOPUS:85104884326
SP - 109
EP - 118
Y2 - 6 July 2020 through 10 July 2020
ER -