Flow-Shop Scheduling Problem aplicado a la programación de reparación de equipos médicos

Translated title of the contribution: Flow-shop scheduling problem applied to programming repair medical equipment

R. Mellado, CLAUDIO ALONSO CUBILLOS FIGUEROA, D. Cabrera

Research output: Chapter in Book/Report/Conference proceedingConference contributionpeer-review

Abstract

This paper proposes to solve planning repair of medical equipment in a hospital in Chile based in the planning type Flow-Shop Scheduling Problem, with the objective to eliminate downtime and minimize the total production time. To deliver a solution with a final makespan as low as possible was used the Tabu Search method. The proposal was tested using a real case study planning and execution of repairs, and the results are promising, since obtaining initial solutions using Tabu Search generated very low planning and time to implement them was feasible to achieve the estimated time.

Translated title of the contributionFlow-shop scheduling problem applied to programming repair medical equipment
Original languageSpanish
Title of host publication2016 IEEE International Conference on Automatica, ICA-ACCA 2016
PublisherInstitute of Electrical and Electronics Engineers Inc.
ISBN (Electronic)9781509011476
DOIs
StatePublished - 8 Dec 2016
Externally publishedYes
Event2016 IEEE International Conference on Automatica, ICA-ACCA 2016 - Curico, Chile
Duration: 19 Oct 201621 Oct 2016

Publication series

Name2016 IEEE International Conference on Automatica, ICA-ACCA 2016

Conference

Conference2016 IEEE International Conference on Automatica, ICA-ACCA 2016
Country/TerritoryChile
CityCurico
Period19/10/1621/10/16

Fingerprint

Dive into the research topics of 'Flow-shop scheduling problem applied to programming repair medical equipment'. Together they form a unique fingerprint.

Cite this