Measuring the impact of maintenance postponement on overall performance in a chilean crushing plant

Orlando Duran, Sebastian Rojas, Paulo Duran

Producción científica: Contribución a una revistaArtículorevisión exhaustiva

6 Citas (Scopus)

Resumen

This study, born as a result of the need to determine the impact of poor adherence to maintenance plans on the main production indicators of a crushing plant. A Montecarlo simulation was performed to determine the relationship and sensitivity between postponement of planned maintenance activities and plant availability. In the same way, a sensitivity analysis was performed to determine the impact of varying the maintenance time and mean production capacity on Overall Equipment Effectiveness (O.E.E.). The proposed approach can be considered as a powerful prioritization tool, since the maintenance manager can measure the effects of postponing preventive maintenance actions on different assets. In that sense, maintainers can define where it is possible to postpone certain activities without affecting importantly the overall production system outputs.

Idioma originalInglés
Número de artículo8447362
Páginas (desde-hasta)1951-1958
Número de páginas8
PublicaciónIEEE Latin America Transactions
Volumen16
N.º7
DOI
EstadoPublicada - jul. 2018

Huella

Profundice en los temas de investigación de 'Measuring the impact of maintenance postponement on overall performance in a chilean crushing plant'. En conjunto forman una huella única.

Citar esto