Throughput-centered physical assets priorization technique

O. Duran, A. Crespo, V. González-Prida, A. Guillén

Producción científica: Capítulo del libro/informe/acta de congresoContribución a la conferenciarevisión exhaustiva

Resumen

This paper proposes a technique for the prioritization of physical assets based on the effect that aspects such as unavailability and utilization at the production levels may cause on system’s throughput. This technique uses as a fundamental parameter the indicator called Overall Throughput Effectiveness (OTE) that allows relating aspects such as the availability of each equipment item, its levels of utilization with the entire system of factory´s throughput. In order to illustrate the feasibility and usefulness of the proposed technique, a case study extracted from the literature is presented and discussed.

Idioma originalInglés
Título de la publicación alojadaSafety and Reliability – Theory and Applications - Proceedings of the 27th European Safety and Reliability Conference, ESREL 2017
EditoresMarko Cepin, Radim Briš
EditorialCRC Press/Balkema
Páginas485-490
Número de páginas6
ISBN (versión impresa)9781138629370
DOI
EstadoPublicada - 2017
Evento27th European Safety and Reliability Conference, ESREL 2017 - Portorož, Eslovenia
Duración: 18 jun. 201722 jun. 2017

Serie de la publicación

NombreSafety and Reliability - Theory and Applications - Proceedings of the 27th European Safety and Reliability Conference, ESREL 2017

Conferencia

Conferencia27th European Safety and Reliability Conference, ESREL 2017
País/TerritorioEslovenia
CiudadPortorož
Período18/06/1722/06/17

Huella

Profundice en los temas de investigación de 'Throughput-centered physical assets priorization technique'. En conjunto forman una huella única.

Citar esto